01-24-2007, 11:17 AM
i need 48 hour days,and i dont think that would help.i want to fix some reels,tie up some rigs,and fly's.replace the floor in my boat,and try turning out some lures.but i decieded to start a part-time buisness,and that seems to be taking most of my time,along with my truck failing emissions,and now i have 30 days to fix it,so the boat is out of the garage and the truck is in,torn apart.and my real job keeps calling me in,and i am supposed to be laidoff.at this rate i might be ready by october.lol[shocked]
[signature]
[signature]